Density Test Report

Date :12/19/2024
Project No :2024C168
Client Company :CCG
Arrival Time :12/19/2024 8:00
Onsite Hours :9:45
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :12/19/2024 17:45
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/19/2024 385 25.2 98.1 26081 102.9 20.0 95.3 95 D2937 Pass
Location : water line in the front of lot#226, Elv/Depth :1 foot below finish grade
Comment : moisture content was high than specified Moisture content limit
12/19/2024 386 28.2 91.6 26082 94.1 24.3 97.3 95 D2937 Pass
Location : water line in the front of lot#228, Elv/Depth :2 feet below finish grade
Comment : moisture content was high than specified Moisture content limit
12/19/2024 387 22.4 98.6 26081 102.9 20.0 95.8 95 D2937 Pass
Location : water line in the front of lot#230, Elv/Depth :1.5 feet below finish grade
Comment :
12/19/2024 388 21.5 101.0 26081 102.9 20.0 98.2 95 D2937 Pass
Location : water line in the front of lot#232, Elv/Depth :finished grade
Comment :
12/19/2024 389 28.4 90.0 26082 94.1 24.3 95.6 95 D2937 Pass
Location : water line in the front of lot#229, Elv/Depth :finish grade
Comment : moisture content was high than specified Moisture content limit
12/19/2024 390 23.4 97.9 26081 102.9 20.0 95.1 95 D2937 Pass
Location : water line in the front of lot#224, Elv/Depth :finished grade
Comment :
12/19/2024 391 22.4 98.0 26081 102.9 20.0 95.2 95 D2937 Pass
Location : water line in the front of lot#226, Elv/Depth :finished grade
Comment :
Technician Signature / DateAminullah Azimi, December 19, 2024