- Density Test Report Report ID: 74483
- Edit Download Report
Density Test Report
Date :12/18/2024
Project No :2024C202
Client Company :CCG
Arrival Time :12/18/2024 07:15
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Sunny
Departure Time :
ASEC Technician Name :Solomon Cherie
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
12/18/2024 | 152 | 30 | 91.2 | S-02 | 97.2 | 24.9 | 93.8 | 95 | D6938 | Fail |
Location : | Lot#73, Elv/Depth : | |||||||||
Comment : | The soil moisture is a little higher than the proctor and hence compaction is less than 95%. This is informed to the super to do more rolling. | Gauge Serial No. :30942 |
Technician Signature / DateSolomon Cherie, December 18, 2024