Density Test Report

Date :12/12/2024
Project No :2024C168
Client Company :CCG
Arrival Time :12/12/2024 12:00
Onsite Hours :04:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :12/12/2024 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/12/2024 369 19.9 98.4 26086 99.8 19.7 98.6 95 D6938 Pass
Location : Backfill of retaining wall, at station 0+60, Elv/Depth :7 feet below finish grtade
Comment : Gauge Serial No. :85759
12/12/2024 370 20.1 99.1 26086 99.8 19.7 99.3 95 D6938 Pass
Location : backfiil retaining wall, at station 0+100, Elv/Depth :6 feet below finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 12, 2024