Concrete Test Report

Date :11/26/2024
Project No :2024C189
Client Company :WSP
Arrival Time :11/26/2024 00:30
Onsite Hours :07:00
Name of the Project :Protovision PH II
Project Location :Lithia Springs
Weather :Cloudy
Departure Time :11/26/2024 07:30
ASEC Technician Name :Solomon Cherie

Concrete Placement Information

Location(S):
Testing: 1 Set of concrete specimens (5 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Cylinders
Pick Up:
1 Sets of concrete cylinders/ 5 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks: In this test, the mix is 3000psi and the results were: Air=1.2% Slump=5.5" Temperature=65°F Unit weight=145.2psi
Technician Signature / DateSolomon Cherie, November 26, 2024