Skip to content

Daily Field Report

Date :11/11/2024
Project No :2021C060
Client Company :Pulte Group
Arrival Time :11/11/2024 07:30
Onsite Hours :03:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :Overcast
Departure Time :11/11/2024 11:00
ASEC Technician Name :Micah Aycock

Observations/Finding

Lot 114/14

53/21

These site’s soil conditions were reviewed and appear suitable for concrete to be poured. Each dcp that was completed on site had blowcounts that were passing. No signs of excessive moisture, soft spots, or loose soil were noted at the footing locations.
There was one area on lot 114/14 that had some extensive overhang of rebar that needed to be cut, the footing foreman (Robert) from Pulte was notified of this.

Technician Signature / DateMicah Aycock, November 11, 2024