- Home
- Daily Field Report Report ID: 72790
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Nature walk: lot 1055 & 1056
- Upon arrival, the contractor ASG was engaged in removing the filled dirt from lot 105 with volvo EC300El . Grey material, organic matter and fire pit is found at 10ft from the ground level. All the unsuitable material is removed and moved to the next location using the dumb trucks and continued for the day.
Seven Hills: Amenities
- Upon arrival, the contractor was engaged in adding fill near the Pickle ball court parking using a Komatsu PC 360LC and cut from the west of the job site. Dirt was being transported with two tandem dumps, while dozing and leveling were performed with a Komatsu D85EX for the next layer and compaction with CAT563E.
- rocks and Boulders are found in the back fill, necessary instructions are made for the proper compaction using the proof roll method and also using D85EX.
- all the slopes are dozed and levelled with Komatsu 39PX.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you