- Concrete Test Report Report ID: 71208
- Edit Download Report
Concrete Test Report
Date :10/10/2024
Project No :2024C195
Client Company :CWM
Arrival Time :10/09/2024 19:00
Onsite Hours :07:45
Name of the Project :Ramp 21 Replacement
Project Location :HJAIA
Weather :
Departure Time :10/10/2024 02:45
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
Testing:
2 Set of concrete specimens (7 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: 2 Sets of concrete cylinders/ 7 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete cylinders/ 7 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
Two sets of seven (7) beams cast.
Technician Signature / DateSolomon Cherie, October 10, 2024
Reviewer Name / DateKenneth Mosman, October 22, 2024