- Home
- Daily Field Report Report ID: 71178
- Edit Download Report
Daily Field Report
Date :10/09/2024
Project No :2024C195
Client Company :CWM
Arrival Time :10/08/2024 17:00
Onsite Hours :10:15
Name of the Project :Ramp 21 Replacement
Project Location :HJAIA
Weather :
Departure Time :10/09/2024 03:15
ASEC Technician Name :Solomon Cherie
Observations/Finding
As requested, our AS Engineering & Consulting LLC representative was on site to observe concrete placement. The following were performed this day:
1) Moisture tests were taken (for rock and sand materials).
2) Air content tests, concrete temperature, slump and unit weight were taken for Truck #1 sampled.
Tests conducted at 261 & 860 cubic yards poured.
3) Two sets of seven (7) beams were cast.
4) Stripped two sets of seven (7) beams and placed in curing.
All concrete tests were found to be within job specifications
Technician Signature / DateSolomon Cherie, October 9, 2024
Reviewer Name / DateKenneth Mosman, October 22, 2024