Skip to content

Daily Field Report

Date :10/02/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :10/02/2024 07:00
Onsite Hours :9:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :Cloudy
Departure Time :10/02/2024 16:00
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

As requested the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes and material submittals.
The following observations were observed on the site this day.

  • Excavation of a trench for the installation and placement of 13 foot long, 12-inch diameter water line for the fire hydrant progressed using CAT(315FL) equipment.
  • The placement of No. 57 atop the water line for the fire hydrant progressed.
  • One (1) foot lifts were placed and compacted for trench backfill using a trench packer (RTSC3).
  • Density test results indicate that the compacted material met the project requirements of 95% the maximum dry density obtained by the (Standard Proctor ASTM 698).

Technician Signature / DateFawad Shagiwal, October 2, 2024
Reviewer Name / DateKenneth Mosman, October 23, 2024