- Home
- Concrete Test Report Report ID: 70563
- Edit Download Report
Concrete Test Report
Date :09/25/2024
Project No :2024C189
Client Company :WSP
Arrival Time :09/25/2024 01:30
Onsite Hours :08:30
Name of the Project :Protovision PH II
Project Location :Lithia Springs
Weather :Cloudy
Departure Time :09/25/2024 10:00
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
Testing:
Set of concrete specimens ( Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: Sets of concrete cylinders/ cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: Sets of concrete cylinders/ cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
About 200 cubic yards of concrete was placed today and four (4) sets of five (5) cylinder each were cast.
Technician Signature / DateSolomon Cherie, September 25, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024