Date :09/12/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/12/2024 8:45
Onsite Hours :9:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :09/12/2024 17:45
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- The placement and compaction of fill soils for water storm trench between, MHA10, MHA11, MH12, MHA12.1, MHB8 to MHB9, and Lot# 13,14,15,16, and contractor was installing water Crouse in the front of lots# 98 to 104, continued this day.
- At the time of arrival, our representative observed that work was in progress with1-foot lifts being placed and compacted using CP56B and trench compaction equipment. Compaction testing was performed using Utilizing the Standard Test Method for Density of Soil in Place by Drive-Cylinder (ASTM D 2937), along with general probing using a 3/8″ diameter probe rod.
- Density test results indicate that most of the compacted materials met the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698.
- Note: contractor placed rocks ( boulders) in the lot 13, 14 and lot 16, 3 feet below finished grade.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, September 12, 2024
Reviewer Name / DateRamchandra Mogulla, September 16, 2024