- Home
- Daily Field Report Report ID: 69674
- Edit Download Report
Daily Field Report
Date :09/07/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :09/07/2024 06:00
Onsite Hours :06:30
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :09/07/2024 12:30
ASEC Technician Name :Solomon Cherie
Observations/Finding
As requested, our AS Engineering & Consulting LLC representative was on site to observe concrete placement. The following were performed this day:
1) Moisture tests were taken (for rock and sand materials).
2) Air content tests, concrete temperature, slump and unit weight were taken for Truck #1 sampled.
3) Stripped one set of seven (7) beams and placed in curing.
3) Cast one set of four (4) 12″ x 6″ cylinders for low slump/low energy concrete.
All concrete tests were found to be within job specifications
Technician Signature / DateSolomon Cherie, September 7, 2024
Reviewer Name / DateKenneth Mosman, October 22, 2024