Skip to content

Density Test Report

Date :09/04/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/04/2024 10:00
Onsite Hours :07:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :09/04/2024 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/04/2024 37 23.4 99.2 26081 102.9 20.0 96.4 95 D2937 Pass
Location : sewer trench, 188 feet to the to the NE from MHSA12., Elv/Depth :finished grade
Comment :
09/04/2024 38 21.8 99.1 26081 102.9 20.0 96.3 95 D2937 Pass
Location : sewer trench, 22 feet to the NE from MHSA12., Elv/Depth :6 feet below finish grade
Comment :
09/04/2024 39 24.1 97.0 26083 102.0 22.1 95.1 95 D2937 Pass
Location : sewer trench, 28 feet to the SW of MHSA 13., Elv/Depth :9 feet below finish grade
Comment :
09/04/2024 40 23.2 97.6 26083 102.0 22.1 95.7 95 D2937 Pass
Location : sewer trench, 88 feet to the SW of MHSA13., Elv/Depth :8 feet below finish grade
Comment :
09/04/2024 41 26.7 90.2 26082 94.1 24.3 95.9 95 D6938 Pass
Location : lot# 21, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
09/04/2024 42 24.3 87.9 26085 92.0 25.3 95.5 95 D6938 Pass
Location : lot# 20., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
09/04/2024 43 25.1 91.0 26082 94.1 24.3 96.7 95 D6938 Pass
Location : lot# 19., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 4, 2024
Reviewer Name / DateRamchandra Mogulla, September 16, 2024