- Daily Field Report Report ID: 69066
- Edit Download Report
Daily Field Report
Date :08/22/2024
Project No :2024C195
Client Company :CWM
Arrival Time :08/22/2024 18:00
Onsite Hours :04:30
Name of the Project :Ramp 21 Replacement
Project Location :HJAIA
Weather :Clear sky
Departure Time :08/22/2024 22:30
ASEC Technician Name :Solomon Cherie
Observations/Finding
As requested, our AS Engineering & Consulting LLC representative was on site to observe concrete placement. The following were performed this day:
1) Moisture tests were taken (for rock and sand materials).
2) Air content tests, concrete temperature, slump and unit weight were taken for Truck #1 sampled.
3) One set of eleven (11) beams were cast from Truck #23.
4) Two sets of seven (7) beams were stripped and placed in curing.
5) Cast one set of four (4) 6″ x 12″ cylinders for low slump/low energy concrete.
All concrete tests were found to be within job specifications.
Technician Signature / DateSolomon Cherie, August 22, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024