- Daily Field Report Report ID: 68845
- Edit Download Report
Daily Field Report
Observations/Finding
I monitored the placement of explosives on all the holes before blasting. Also observed the impact of blasting on the ground and took pictures. A total of 174 explosives were blasted.
The above-mentioned AS Engineering and Consulting (ASEC) representative, visited the Naturewalk at 7 Hills Amenities site to conduct quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site:
- Rock Volume Determination for the blast was performed on this date: Rock volume was determined
based on the attached drill logs. Drilling was performed on the days leading to today and depths to
top of rock and termination was recorded. - Drilled and completed 174 blasting locations.
- The total quantity of mass rock shot on this day was calculated to be 2,742.2 cubic yards.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding
this report, please feel free to contact us. We will be more than happy to discuss it with you.
Site after blasting
Picture depcting depth of blasting
Smoke immediately after blasting.
The guy confirming that exosives are put on all holes and wires are connected
Several crew members putting explosives and connecting wires.
Entire area of blasting.