- Concrete Test Report Report ID: 68571
- Edit Download Report
Concrete Test Report
Date :08/09/2024
Project No :2024C195
Client Company :CWM
Arrival Time :08/08/2024 19:00
Onsite Hours :08:45
Name of the Project :Ramp 21 Replacement
Project Location :HJAIA
Weather :Clear sky
Departure Time :08/09/2024 03:45
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
Testing:
2 Set of concrete specimens (7 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: 2 Sets of concrete cylinders/ 7 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete cylinders/ 7 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
Our representative performed slump, air content, concrete temperature and unit weight tests on fresh concrete sampled. All tests met job specifications. Two (2) sets of test specimens were cast.
Technician Signature / DateSolomon Cherie, August 9, 2024
Reviewer Name / DateKenneth Mosman, August 11, 2024