Skip to content

Density Test Report

Date :08/07/2024
Project No :2024C168
Client Company :CCG
Arrival Time :08/07/2024 10:00
Onsite Hours :04:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :08/07/2024 14:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/07/2024 1 25 88.0 26085 92.0 25.3 95.7 95 D6938 Pass
Location : Lot #170, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
08/07/2024 2 27.3 91.0 26082 94.1 24.3 96.7 95 D6938 Pass
Location : Lot #169, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
08/07/2024 3 22.1 98.4 26081 102.9 20.0 95.6 90 D6938 Pass
Location : Sewer trench 141 feet SE of MH A9, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
08/07/2024 4 25.1 89.6 26082 94.1 24.3 95.2 95 D6938 Pass
Location : Sewer trench 110 feet NW of MH A10, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :85759
08/07/2024 5 27.3 89.5 26082 94.1 24.3 95.1 95 D6938 Pass
Location : Lot #199, Elv/Depth :11 feet below finished grade
Comment : Gauge Serial No. :85759
08/07/2024 6 27.3 91.2 26082 94.1 24.3 96.9 95 D6938 Pass
Location : Lot #98, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, August 7, 2024
Reviewer Name / DateKenneth Mosman, August 11, 2024