Density Test Report

Date :08/03/2024
Project No :2024C168
Client Company :CCG
Arrival Time :08/03/2024 8:00
Onsite Hours :06:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :08/03/2024 14:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/03/2024 1 27.3 91.0 26082 94.1 24.3 96.7 95 D6938 Pass
Location : Lot #193, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 2 24.1 98.1 26081 102.9 20.0 95.3 95 D6938 Pass
Location : Lot #194, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 3 27.3 113.9 26082 94.1 24.3 95.1 95 D6938 Pass
Location : Lot #195, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 4 24.9 91.8 26082 94.1 24.3 97.6 95 D6938 Pass
Location : Lot #111, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 5 23.2 90.9 26082 94.1 24.3 96.6 95 D6938 Pass
Location : Lot #110, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 6 23.2 91.6 26082 94.1 24.3 97.3 95 D6938 Pass
Location : Lot #109, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
08/03/2024 7 24.1 90.8 26082 94.1 24.3 96.5 95 D6938 Pass
Location : Lot #108, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, August 3, 2024
Reviewer Name / DateKenneth Mosman, August 11, 2024