Skip to content

Daily Field Report

Date :06/10/2024
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :06/10/2024 07:30
Onsite Hours :10:00
Name of the Project :Lakeside Sub. - Lovers Lane, Calhoun
Project Location :Calhoun
Weather :sunny
Departure Time :06/10/2024 17:30
ASEC Technician Name :Marteze Jeter

Observations/Finding

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

Upon arrival at the site, backfilling activities were underway for the sanitation sewer. Contractors used CAT Excavators 336 and 315F and heavy-duty dump trucks. Backfilling was performed in 2-foot lifts between manholes 4.9 and 4.10. Contractor added No. 57 stone to 6 inches above the pipe. A walk behind roller was then used for compaction.

Observations:

  1. Backfilling Activities:
    • Backfilling was in progress for the sanitation sewer, utilizing 2-foot lifts between manholes 4.8 and 4.9.
  2. Compaction Status:
    • Compaction was not carried out on the west side of AE1, with the foreman indicating it as a temporary measure.

Conclusion: The ongoing backfilling and storm drainpipe installation activities are progressing as planned, with considerations for lift sizes and temporary measures discussed with the foreman.

Technician Signature / DateMarteze Jeter, June 10, 2024
Reviewer Name / DateKenneth Mosman, August 06, 2024