- Daily Field Report Report ID: 68292
- Edit Download Report
Daily Field Report
Date :07/30/2024
Project No :2024C116
Client Company :Peeples Owner, LLC
Arrival Time :07/30/2024 08:30
Onsite Hours :08:30
Name of the Project :Peeples Valley Rd, Overlook at Pettit
Project Location :Cartersville
Weather :Cloudy
Departure Time :07/30/2024 17:00
ASEC Technician Name :Fawad Shagiwal
Observations/Finding
As requested the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes and material submittals.
The following observations were observed on the site this day:
- The placement and installation of RCC precast box culverts for the outlet area of the detention pond was in progress.
- 40 precast RCC box culvert segments were placed and installed.
- Construction joints of RCC precast box culverts were covered by lean concrete.
- Excavation of the trench and installation of sewer water lines and manholes was progressed.
Technician Signature / DateFawad Shagiwal, July 30, 2024
Reviewer Name / DateKenneth Mosman, August 06, 2024