Skip to content

Density Test Report

Date :07/24/2024
Project No :2024C168
Client Company :CCG
Arrival Time :07/24/2024 13:30
Onsite Hours :05:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :07/24/2024 18:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/24/2024 1 28.9 89.4 26082 94.1 24.3 95.0 95 D6938 Fail
Location : Lot #106, Elv/Depth :5.5 feet below finished grade
Comment : Gauge Serial No. :85759
07/24/2024 2 25.5 112.2 26082 94.1 24.3 95.0 95 D6938 Fail
Location : Lot #107, Elv/Depth :5.5 feet below finished grade
Comment : Gauge Serial No. :85759
07/24/2024 3 26.9 91.3 26082 94.1 24.3 97.0 95 D6938 Pass
Location : Lot #108, Elv/Depth :5.5 feet below finished grade
Comment : Gauge Serial No. :85759
07/24/2024 4 26.9 85.3 26082 94.1 24.3 90.6 95 D6938 Fail
Location : Lot #109, Elv/Depth :5 feet below finished grade
Comment : Recompaction and retesting is required Gauge Serial No. :85759
07/24/2024 5 26.3 91.6 26082 94.1 24.3 97.3 95 D6938 Pass
Location : Lot #110, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, July 24, 2024
Reviewer Name / DateKenneth Mosman, July 25, 2024