Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made during our evaluation:
Graded Aggregate Base (GAB) Testing Report
Upon arrival, it was observed that the graded aggregate base (GAB) was not yet ready for testing. Approximately 50% of the GAB of the future roadway had been placed (see photo) but not fully compacted. As a result, no testing was performed on this day.
Starting location of GAB placement for 7/16