Daily Field Report

Date :06/11/2024
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :06/11/2024 08:00
Onsite Hours :9:30
Name of the Project :Lakeside Sub. - Lovers Lane, Calhoun
Project Location :Calhoun
Weather :sunny
Departure Time :06/11/2024 17:30
ASEC Technician Name :Marteze Jeter

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made:

Our representative observed the contractor place backfill using a CAT 336 excavator and Cat 315F excavator to place sewer main from MH 6.3 – 7.0. After the placement of PVC pipe the contractor then added No. 57 stone to 6 inches above pipe.  Contractor also started to excavate MH 4.6 – 5.0 using a Komatsu excavator pc490 LC.  Contractor then placed storm drain and backfilled with walk-behind roller.

Observations:

  1. Backfilling Activities:
    • Backfilling was in progress for the sanitation sewer, and storm drain
  2. Sewer Installation:
    • Sewer main was placed between MH 6.3-7.0
    • storm drain was placed between MH 4.6-5.0
  3. Compaction Status:
    • Compaction was performed using a walk behind roller

Conclusion: The ongoing backfilling and storm drainpipe installation activities are progressing as planned, with considerations for lift sizes and temporary measures discussed with the foreman.

Technician Signature / DateMarteze Jeter, June 11, 2024
Reviewer Name / DateKenneth Mosman, July 19, 2024