Skip to content

Density Test Report

Date :06/29/2024
Project No :2024C168
Client Company :CCG
Arrival Time :06/29/2024 9:00
Onsite Hours :06:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :06/29/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/29/2024 1 27.3 94.7 26082 94.1 24.3 100.6 95 D6938 Pass
Location : Lot #172, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2024 2 27.1 95.9 26082 94.1 24.3 101.9 95 D6938 Pass
Location : Lot #171, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2024 3 26.3 94.1 26082 94.1 24.3 100.0 95 D6938 Pass
Location : Lot #170, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2024 4 27.1 93.8 26082 94.1 24.3 99.7 95 D6938 Pass
Location : Lot #172, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2024 5 27.3 94.3 26082 94.1 24.3 100.2 95 D6938 Pass
Location : Lot #171, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 29, 2024