Daily Field Report
Date :06/28/2024
Project No :2024C168
Client Company :CCG
Arrival Time :06/28/2024 8:30
Onsite Hours :08:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :06/28/2024 17:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site:
- A proof-roll observation was performed before fill placement for the area of Lots #169, 170, 171, 172, 98 and 99.
- A fully loaded tandem-axle dump truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.
No severe yielding and/or deflection was observed during the proof-roll in the areas mentioned above.
In addition, work progressed for detention ponds 1 and 2. Fill placement for Lots #98 and 99 began this day.
Technician Signature / DateAminullah Azimi, June 28, 2024