Density Test Report

Date :04/25/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :06/25/2024
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :
Departure Time :06/25/2024
ASEC Technician Name :Zabihullah Lodin

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/25/2024 1 17.5 97.4 Infinity 90 D6938 Pass
Location : Comm duct bank 70 feet south from the existing comm manhole, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
04/25/2024 2 21.6 89.5 Infinity 90 D6938 Pass
Location : Comm ductbank 70 feet south from the existing comm manhole, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
04/25/2024 3 20 94.7 Infinity 90 D6938 Pass
Location : Comm ductbank 70 feet south from the existing comm manhole, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateZabihullah Lodin, April 25, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024