Density Test Report

Date :04/24/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :04/24/2024
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :
Departure Time :04/24/2024
ASEC Technician Name :Zabihullah Lodin

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/24/2024 1 18.6 96.5 Infinity 90 D6938 Pass
Location : 10 feet south from existing comm manhole, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
04/24/2024 2 17.9 95.2 Infinity 90 D6938 Pass
Location : 10 feet south from existing comm manhole, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateZabihullah Lodin, April 24, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024