Skip to content

Density Test Report

Date :03/22/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :03/22/2024 10:00
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :
Departure Time :03/22/2024
ASEC Technician Name :Zabihullah Lodin

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/22/2024 1 24.9 88.9 Infinity 79.7 D6938 Pass
Location : East of N13 and south of runway 27 south, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
03/22/2024 2 25.2 92.3 Infinity 82.7 D6938 Pass
Location : East of N13 and south of runway 27 south, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateZabihullah Lodin, March 22, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024