- Home
- Density Test Report Report ID: 67202
- Edit Download Report
Density Test Report
Date :03/20/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :06/20/2024 10:00
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :
Departure Time :06/21/2024
ASEC Technician Name :Zabihullah Lodin
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
03/21/2024 | 1 | 27 | 93.1 | Infinity | 83.5 | D6938 | Pass | |||
Location : | East of N13 and south of runway 27 south, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. : | |||||||||
03/21/2024 | 2 | 261 | 33.1 | Infinity | 8493 | D6938 | Pass | |||
Location : | East of N13 and south of runway 27 south, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. : |
Technician Signature / DateZabihullah Lodin, March 20, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024