Daily Field Report

Date :06/07/2024
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :06/07/2024 08:00
Onsite Hours :9:30
Name of the Project :Lakeside Sub. - Lovers Lane, Calhoun
Project Location :Calhoun
Weather :Sunny
Departure Time :06/07/2024 17:30
ASEC Technician Name :Marteze Jeter

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made:

Our representative observed the contractor use a CAT 336 excavator and CAT 315F excavator to excavate the sewer trench from MH 4.9-4.10. Contractor then used a CAT 315F to place sewer laterals and added No. 57 stone to 6 inches above pipe. Contractor then used a heavy-duty dump truck to transport GAB to the newly placed sewer. Contractor added GAB and backfill from MH 4.9-4.10 and compacted the trench with a walk-behind roller.

 

Observations:

  1. Backfilling Activities:   Contractors placed backfill in sewer laterals and storm trenches. Also Added 6 inches of No. 57 stone, then a GAB.
  2. Storm Drainpipe Installation:  Contractors inserted 351F sewer lateral.
  3. Compaction Status: Compaction above all laterals were sufficient

 

Conclusion: The ongoing backfilling and storm drainpipe installation activities are progressing as planned.

Technician Signature / DateMarteze Jeter, June 7, 2024
Reviewer Name / DateKenneth Mosman, July 18, 2024