Concrete Test Report
Date :06/18/2024
Project No :2020G014-7
Client Company :United
Arrival Time :06/18/2024 02:00
Onsite Hours :05:30
Name of the Project :I-75 Pavement Evaluation
Project Location :Emerson
Weather :sunny
Departure Time :06/18/2024 07:30
ASEC Technician Name :Marteze Jeter
Concrete Placement Information
Location(S):
Testing:
2 Set of concrete specimens (6 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: 2 Sets of concrete cylinders/ 6 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 2 Sets of concrete cylinders/ 6 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
project number 0015051
set 1 Set 2
slump 0.5 slump 2
air 5 Air 6
temp 75 temp 75
air temp 75 air temp 71
Technician Signature / DateMarteze Jeter, June 18, 2024
Reviewer Name / DateKenneth Mosman, July 20, 2024