Daily Field Report

Date :02/26/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/26/2024 8:00
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :Sunny
Departure Time :02/26/2024 11:00
ASEC Technician Name :Ramchandra Mogulla

Observations/Finding

This report documents the observations and assessments performed by the undersigned ASEC representative at the request of the Client and/or Contractor. The purpose of this site visit was to evaluate the newly installed soil cement subgrade for the interior roads of the future subdivision.

Visual observation techniques were employed to ensure that the work in place adhered to the Project Plans, Specifications, Codes, Standards, and Material Submittals.

A fully loaded tandem axle dump truck was used to conduct the proof-rolling assessment (shown in the attached pictures). The truck was driven over both lanes of the interior roads to verify the integrity and stability of the subgrade. The vehicle’s weight and movement were utilized to identify any potential areas of distress or instability in the subgrade.

During the proof-roll operation, no areas of severe distress were observed or noted. The subgrade exhibited little to no signs of deflection, rutting, pumping, or any other forms of instability.

Based on the visual observations and the results of the proof-rolling assessment, the subgrade appears to be acceptable for further construction activities. The work performed by the contractor for the installation of the soil cement subgrade was found to be in general accordance with the project specifications and requirements.

Given the satisfactory performance observed during the proof-rolling, we recommend proceeding with the subsequent phases of construction. It is advisable to continue visually inspecting the subgrade condition as construction progresses to ensure ongoing compliance with project standards.

We appreciate the opportunity to provide our services on this project. Should you have any additional questions or comments regarding this report, please do not hesitate to contact us.

Technician Signature / DateRamchandra Mogulla, February 26, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024