Skip to content

Density Test Report

Date :06/12/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :06/12/2024 9:00
Onsite Hours :06:00
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :06/12/2024 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/12/2024 1 15.9 100.3 P-02 105.9 18.8 94.7 95 D6938 Fail
Location : Lot #18, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
06/12/2024 2 16.3 97.2 P-02 105.9 18.8 91.8 95 D6938 Fail
Location : Lot #19, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :38069
06/12/2024 3 15.7 98.4 P-02 105.9 18.8 92.9 95 D6938 Fail
Location : Lot #20, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 12, 2024
Reviewer Name / DateKenneth Mosman, July 19, 2024