Skip to content

Daily Field Report

Date :06/12/2024
Project No :2024C116
Client Company :Peeples Owner, LLC
Arrival Time :06/12/2024 09:00
Onsite Hours :08:00
Name of the Project :Peeples Valley Rd, Overlook at Pettit
Project Location :Cartersville
Weather :Sunny
Departure Time :06/12/2024 17:00
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.

The following observations were observed on the site this day:

  • The placement and compaction of backfill for Section 3 was in progress using CP54B, RA30, D51PX and CAT330 equipment.
  • The new drainage trench was excavated to drain water from the lots area into the trench on their own gravity, and then pump out the water from the trench into the creek.
  • At the time of arrival our representative observed that the work was in progress at Section 3 with 10-inch lifts being placed and compacted using CP54B, RA30 and D51PX equipment.

Technician Signature / DateFawad Shagiwal, June 12, 2024
Reviewer Name / DateKenneth Mosman, July 19, 2024