Density Test Report

Date :06/07/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :06/07/2024 9:00
Onsite Hours :05:30
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :06/07/2024 14:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/07/2024 1 15.8 98.9 P-02 105.9 18.8 93.4 95 D6938 Fail
Location : Lot #8, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
06/07/2024 2 16.3 97.4 P-02 105.9 18.8 92.0 95 D6938 Fail
Location : Lot #8, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 7, 2024
Reviewer Name / DateKenneth Mosman, July 18, 2024