Daily Field Report

Date :05/21/2024
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :05/21/2024 08:00
Onsite Hours :9:30
Name of the Project :Lakeside Sub. - Lovers Lane, Calhoun
Project Location :Calhoun
Weather :Sunny
Departure Time :05/21/2024 17:30
ASEC Technician Name :Marteze Jeter

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

Our representative observed the contractors place backfill. Contractors used an excavator place soil via a heavy-duty dump truck transporting soil to the entrance way. Contractors then used a compactor to place and compact soil in 6-inch lifts. Our representative then used a 3/8″ diameter probe rod to check stability.

The ASEC Engineering representative also observed the contractor fill storm trench pipe bedding with #57 stone.

 

Observations:

  1. Backfilling Activities:
    • Backfilling was in progress for the storm trench, with #57 stone.
  2. Compaction Status:
    • Compaction in the entranceway was stable.

Conclusion: The ongoing backfilling and storm drainpipe installation activities are progressing as planned, with considerations for lift sizes and temporary measures discussed with the foreman.

Technician Signature / DateMarteze Jeter, May 21, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024