Skip to content

Daily Field Report

Date :05/31/2024
Project No :2023C206
Client Company :CWM-JVTECH
Arrival Time :05/31/2024 6:00
Onsite Hours :9:00
Name of the Project :Concourse D Widening
Project Location :HJAIA
Weather :sunny
Departure Time :05/31/2024 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to visually observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made during our evaluation:

  • A pre-pour and concrete observation was performed in concourse D, panels 21, 23 and panel 31, on this day.  The contractor completed rebar and dowel placement for these panels,
  • The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were required.
  • Contractor cleaned loose rock and debris and puddles of water from the base.
  • Dowel bars have epoxy. Embedment depth was found to be 15″ into concrete.
  • The reinforcing steel was checked for correct size, number of bars, location of bars, spacing, cleanliness, support against displacement, splicing, clearance and steel grade. Based on visual observations and field measurements, the reinforcing steel at the utility panel, appeared to be acceptable for size, spacing and quantity.
  • Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time
  • Our representative along with ATLQA and ATLNext representatives and CWM rep signed the pre-pour card.

Technician Signature / DateAminullah Azimi, May 31, 2024
Reviewer Name / DateKenneth Mosman, July 15, 2024