Skip to content

Density Test Report

Date :05/29/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :05/29/2024 9:00
Onsite Hours :08:00
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :05/29/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/29/2024 1 21.1 97.9 P-02 105.9 18.8 92.4 95 D6938 Fail
Location : Lot #16 basement , Elv/Depth :basement finished grade
Comment : Gauge Serial No. :38069
05/29/2024 2 16.3 99.2 P-02 105.9 18.8 93.7 95 D6938 Fail
Location : Lot #15 basement , Elv/Depth :basement finished grade
Comment : Gauge Serial No. :38069
05/29/2024 3 15.5 98.5 P-02 105.9 18.8 93.0 95 D6938 Fail
Location : Lot #16, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
05/29/2024 4 16.6 98.4 P-02 105.9 18.8 92.9 95 D6938 Fail
Location : Lot #15, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :38069
05/29/2024 5 17.1 99.3 P-02 105.9 18.8 93.8 95 D6938 Fail
Location : Lot #15, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
05/29/2024 6 17.2 97.0 P-02 105.9 18.8 91.6 95 D6938 Fail
Location : Lot #16, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, May 29, 2024
Reviewer Name / DateKenneth Mosman, July 15, 2024