- Home
- Daily Field Report Report ID: 66673
- Edit Download Report
Daily Field Report
Date :05/21/2024
Project No :2022C106
Client Company :CWM
Arrival Time :05/21/2024 11:00
Onsite Hours :04:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :05/21/2024 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- Observed the compaction of GAB at the shoulder of NLVR located to the west of Taxiway 2022.
- At the time of arrival, the contractor had already compacted GAB up to finished grade.
- Compaction testing was performed using Troxler nuclear density gauge.
- Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density obtained by a Modified Proctor ASTM D1557.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, May 21, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024