Daily Field Report

Date :05/16/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :05/16/2024 13:00
Onsite Hours :04:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :05/16/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • Observed the subcontractor (Lewis contracting) continue backfilling in the area of the manhole placed at the 30″ in-line valve approximately at STA 7016+27 (area measured 37′ (L)x 8′ (W)) and an area measuring approximately 15′(L)x 8′(w) at STA 7005+40. Also observed the placement 9 cubic yards of 3000 psi for mentioned locations.
  • At the time of arrival, our representative observed that work was in progress with 6-inch lifts being placed. Subcontractor used a front loader to place the GAB in the area and spread using the bucket of the mini excavator CAT 315F. These materials were then compacted using a trench and jumping jack plat compactor.
  • Compaction testing was performed using a Troxler nuclear density gauge.
  • Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density obtained by the Modified  Proctor ASTM D1557.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, May 16, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024