Skip to content

Density Test Report

Date :05/14/2024
Project No :2022C106
Client Company :CWM
Arrival Time :05/14/2024 9:00
Onsite Hours :04:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :cloudy
Departure Time :05/14/2024 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/14/2024 1 5.5 133.5 GAB 1 135.6 6.8 98.5 95 D6938 Pass
Location : 42' west from east end NLVR, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
05/14/2024 2 5.4 133.6 GAB 1 135.6 6.8 98.5 95 D6938 Pass
Location : 72' west from east end NLVR, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
05/14/2024 3 5.1 133.1 GAB 1 135.6 6.8 98.2 95 D6938 Pass
Location : 122' west from east end NLVR, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, May 14, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024