Density Test Report

Date :05/08/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :05/08/2024 9:00
Onsite Hours :08:00
Name of the Project :Sterlington
Project Location :Canton
Weather :cloudy
Departure Time :05/08/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/08/2024 1 16 103.2 P-02 105.9 18.8 97.5 95 D6938 Pass
Location : STA 1+19.2, Elv/Depth :1 foot below top of wall.
Comment : Gauge Serial No. :38069
05/08/2024 2 19.1 99.7 P-02 105.9 18.8 94.1 95 D6938 Fail
Location : STA 0+81.75, Elv/Depth :5 feet below top of wall.
Comment : Recompaction required Gauge Serial No. :38069
05/08/2024 3 16.6 104.7 P-02 105.9 18.8 98.9 95 D6938 Pass
Location : STA 0+28.5, Elv/Depth :1 foot below top of wall
Comment : Gauge Serial No. :38069
05/08/2024 4 17.6 116.9 P-02 105.9 18.8 93.9 95 D6938 Fail
Location : STA 1+32.00, Elv/Depth :finished grade
Comment : Recompaction required Gauge Serial No. :38069
05/08/2024 5 14.6 99.7 P-02 105.9 18.8 94.1 95 D6938 Fail
Location : STA 0+81.75, Elv/Depth :4 feet below top of wall.
Comment : Recompaction required Gauge Serial No. :38069
05/08/2024 6 17.4 102.9 P-02 105.9 18.8 97.2 95 D6938 Pass
Location : STA 0+46.50, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, May 8, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024