- Home
- Daily Field Report Report ID: 66423
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative arrived onsite to observe CMU block placement for retaining wall #1.
Every 3rd course of block “Geo-Grid” was placed.
No. 57 stone was utilized 1 foot behind the block and within the cells.
No backfill was placed on this day due to the fill material being high in moisture content.
In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.