- Home
- Daily Field Report Report ID: 66209
- Edit Download Report
Daily Field Report
Date :04/22/2024
Project No :2022C106
Client Company :CWM
Arrival Time :04/22/2024 8:00
Onsite Hours :08:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :04/22/2024 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift
- Kelly construction continued stripping the topsoil at east side of asphalt shoulder, phase 7B.
- Kelly construction was grading NLVR road located in the east and west asphalt shoulder of Taxiway 20222.
- In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Technician Signature / DateAminullah Azimi, April 22, 2024
Reviewer Name / DateKenneth Mosman, May 23, 2024