Daily Field Report

Date :04/17/2024
Project No :2022C106
Client Company :CWM
Arrival Time :04/17/2024 6:00
Onsite Hours :12:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :04/17/2024 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • A proof-roll observation was performed on the shoulder located in the east of Taxiway 22 phase 7B.
  • A fully loaded water truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.
  • No severe yielding and/or deflection was observed during the proof-roll at all areas mentioned above.
  • Our representative along with Thomas of ATLQA and the ATLNext representative Braylyn observed the proof-roll.
  • Installation of power lines for lights at western shoulder performed.
  • ATL paving poured asphalt at eastern and western shoulder of phase 7A.
  • Observed the placement and testing of concrete for west curb project at east roadway inside lane. from STA 107+40 to 108+90.
  • Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time.

Technician Signature / DateAminullah Azimi, April 17, 2024
Reviewer Name / DateKenneth Mosman, May 23, 2024