Density Test Report

Date :04/07/2024
Project No :2022C106
Client Company :CWM
Arrival Time :04/07/2024 8:00
Onsite Hours :06:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :
Departure Time :04/07/2024 14:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/07/2024 1 5 131.4 GAB 1 135.6 6.8 96.9 95 D6938 Pass
Location : Storm water pipe, 52 feet from A2, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
04/07/2024 2 5.1 130.1 GAB 1 135.6 6.8 95.9 95 D6938 Pass
Location : storm water line, 121 feet west of MHA-2, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
04/07/2024 3 5.6 115.5 Infinity D6938 Pass
Location : Existing storm pipe, 60 feet North of NLVR , Elv/Depth :9 inches below finished grade
Comment : Note: We need add proctor of M10 for result, Gauge Serial No. :85759
04/07/2024 4 7.5 132.1 Infinity D6938 Pass
Location : Existing storm water pipe, 15 feet west of NLVR , Elv/Depth :8 inches below finish grade
Comment : Note: need to add proctor for M10 for result, Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 7, 2024
Reviewer Name / DateKenneth Mosman, April 26, 2024