Daily Field Report

Date :03/21/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :03/21/2024 7:30
Onsite Hours :06:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :03/21/2024 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of M10 fill for end around water line bend 11 at STA 7005+30.86, continued this day.
  • At the time of arrival, our representative observed that work was in progress with 6 inches lifts being placed and compacted using jumping and trench  compaction equipment.
  • Density test results indicate that the compacted materials met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698).  General probing using a 3/8″ diameter probe rod was also performed. 

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, March 21, 2024
Reviewer Name / DateKenneth Mosman, March 28, 2024