- Daily Field Report Report ID: 64924
- Edit Download Report
Daily Field Report
Date :03/14/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/14/2024 08:00
Onsite Hours :07:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :03/14/2024 15:00
ASEC Technician Name :Fawad Shagiwal
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications applicable codes and materials submittals. The following observations were observed in the site today.
- Placement of fill soils and compaction of Lots #31 to #37, #41 to #45 and #49 to #53 were in-progress using (D8T), (Q-4) and (CP56B) compaction equipment.
- At the time of arrival our representative observed that the work was in progress on sewer pipe trench placement between MH A5 to MH A6 with 1 foot lifts being placed and compacted using a sheep-foot (CP44B) compactor.
Technician Signature / DateFawad Shagiwal, March 14, 2024
Reviewer Name / DateKenneth Mosman, March 17, 2024