- Home
- Daily Field Report Report ID: 64411
- Edit Download Report
Daily Field Report
Date :02/23/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/23/2024 8:00
Onsite Hours :05:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :cloudy
Departure Time :02/23/2024 13:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- Sunbelt Asphalt. Base course was placed with approximately 6 inches of Cement Treated Base (CTB) from STA 6+00 to STA 11+00.
- Performed density tests, on roadway between Lots #36 and #38 and between Lots #1 and #25 and in the front of Lot #40.
- A sample of the soil cement materials were taken back to our lab for further testing.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, February 23, 2024
Reviewer Name / DateKenneth Mosman, March 15, 2024