- Home
- Density Test Report Report ID: 64271
- This project is inactive from admin.Download Report
Density Test Report
Date :02/19/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/19/2024 8:30
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :02/19/2024 12:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/19/2024 | 1 | 20.8 | 121.8 | 24209 | 111.6 | 16.5 | 90.3 | 90 | D6938 | Pass |
Location : | adjacent to retaining wall 9 (location shown in pictures), Elv/Depth :4 feet below from top of retaining wall | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/19/2024 | 2 | 20.2 | 120.3 | 24208 | 110.4 | 16.3 | 90.7 | 90 | D6938 | Pass |
Location : | in the front of retaining wall 9 (location shown in the picture), Elv/Depth :8 feet below from top of wall | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 19, 2024
Reviewer Name / DateRamchandra Mogulla, September 05, 2024